Heritage Glass were engaged to design and construct a five storey seamless curtain wall that wraps around the facade of the building and an adjacent three-sided glass box external staircase. Over 4,000m2 of Alucabond cladding was moulded and wrapped to compliment the architectural design of the facade.
The curtain wall facade presented many challenges; each elevation of the building was on a different plane and joined at different angles. Expertise in complex glass facades meant that Heritage Glass was able to design and fabricate the frames and glass from shop drawings and ensure all glass to glass corners would meet and align perfectly.
The external façade had to work in with the steel tolerances of the building’s structure and allow the fitting of the timber fins between the frames of glass. Heritage Glass designed and produced custom made sections that would allow not only Heritage Glass, but other trades involved on the project, to achieve the architects design intent.
The design and complex shape of the external staircase posed a challenge on the project but Heritage Glass was able to successfully overcome this. Through the process of using spider fittings, having an onsite team measuring and surveying the spider fitting brackets and also applying 3D modeling to set out the staircase, Heritage Glass was able to set out each spider fitting and order and install the glass insufficient time to meet the deadlines.
Cockram Construction PL
Architect
Design Inc
Completed
December 2012
Location
Waurn Ponds, Geelong